11/21
Lab Lecture 13 Slides are up. Project Report Description is here.
Reports are due at 4pm on Fri 12/5 both on paper/in person in 125 Cory and electronically to your project submission directory.
The electronic version need not have all your diagrams, come to lab lecture for details.
11/19
File submission directories are availible. Check the group signup sheet for your official group name.
Submit only *.V, *.EDN, etc source files. Submit path: "\\fileservice\cs150\cs150\2003Fall\[YourGroupName]".
ALL FILES MUST BE SUBMITTED BY 10am ON YOUR CHECKOFF DAY.
11/17
Project checkoff instructions and signups are now availible.
You must sign up for a group name by Thursday 11/20 at 11am to be able to submit your project.
Submission details will be posted Thursday 11/20 by 5pm. Please read the instructions carefully.
11/17
Add this module at the end of your testbench if you're having trouble with glbl.GSR. Apologies for leaving it out of lab lecture -Greg.
module glbl(); wire GSR; endmodule
11/12
Motion test stream generator posted:
bitfile
instructions
11/19
There is lab lecture on Friday. More project checkoff information! Also, we'll go over the project report.
11/10
Grade distribution for Quiz 2 posted
(corrected).
11/09
There will be no official lab or discussion on Tuesday, Nov 11 due to Veterans Day.
Some TAs may still be around.
Read the newsgroup for design review 4 (last one) requirements.
11/07
Quiz 2 mean 73, s.d. 18. Solutions available in lab lecture.
11/06
Minor bug in the distributed encoder. If you're using it try the new version...
10/31 Checkpt 4 and 5 changes.
No change to design reviews as listed in project spec.
Due to quiz, checkpoint 4 demo now due by Mon. 11/10 (11/11 is holiday)
Checkpoint 5 demo dropped.
Final demo changed: Demonstrate block motion estimation on 2 consecutive
frames at a 1 Hz rate and show motion vectors on video display.
(by Fri. Nov.21 for early completion bonus, or by Wed. Nov. 26.)
+5 bonus for 30 Hz update rate during your demo time.
10/30
Reminder: Quiz 2 in class Nov. 6, closed book and closed notes.
10/24 Checkpoint Due Date Update (Tell your friends)
Checkpoint2 is due today at 4pm, We will post our encoder at 4pm sharp you may checkoff through tuesday for 75% credit with OUR encoder
Checkpoint3 will be due Tuesday 11/4 for FULL credit
Checkpoint4 will be due Friday 11/7 but will be TRIVIAL
Please remember to get some sleep
10/24
Checkpoint #3 and Lab Lecture #9 are up.
10/23
Link added to RISC SPM assembler under Links
10/21
Utility modules have been updated to include SRL16E
10/18
Utility modules required for the project posted on the left.
10/16
Checkpoint2 files and slides are up and final! Feel free to start reading...
10/11
Checkpt1 demo due by Friday 10/17 for full credit. Extra Friday TA hours for
checkoffs 11-12, 1-2, 3-4. Last checkoff slot available is 350 pm Friday.
10/11
See newsgroup for check point 2 design review details.
10/8
Project references page added.
10/8
Grade distribution for Quiz 1 posted.
10/7
Project handouts and descriptions today in class! Be there!
10/4
The Project Demo is now working in the lab. Tune to channel 20 on the LCDs and see...
10/3
For information about the Verilog HDL, Video, Synplify and more please see Useful Documentation under the links heading at left.
9/5
All discussions meet in 125 Cory from now on (as stated below).
8/26
Lab 11 moved to 8-11 am Tuesday, Lab 15 moved to 8-11 am Thursday.
Mon 9-10 discussion section cancelled.
8/28
All labs and discussions meet in 125 Cory.
Lab lecture on Friday 8/29 meets in 125 Cory.
There are no discussions on Monday 9/1 (Labor Day).
8/21 Discussion sections
and labs start week of 9/1/03.
8/19 web page started.